Arched Steel Bridges - Verona/Padua high-speed rail line
As part of the Verona-Padua High Speed/High Capacity railway project between PK 7+657 and PK 13+725, LMSteel Consulting was in charge of the "design for manufacturing" construction planning of 3 Arched Bridges called " FIBBIO”, “ILLASI”, “ALPONE” and the n. 5 spans in incorporated beams for a total of 5000 tons of metal carpentry.
The project is part of the Turin-Milan-Venice HS/HC line and is part of the Mediterranean Corridor of the Ten-T network (core network), the strategic trans-European transport infrastructure that reaches from Spain to the Hungarian border with Ukraine.
Connecting Verona to Padua with high speed means completing the railway connection between Milan and Venice, serving 75% of the Italian population with fast trains, and completing a fundamental piece of the Ten-T corridor.
The overall project crosses 22 municipalities (8 in the province of Verona, 10 in the province of Vicenza and 4 in the province of Padua) and is divided into three functional lots. The route of the new HS/HC line originates from the Verona Porta Vescovo station (not included in the project) and ends in the Padua station, near the interconnection junction.
The tracks will mainly run alongside the historic Milan-Venice line, with the exception of a stretch of approximately 22 km along which the new line departs to avoid crossing the inhabited center of the municipality of San Bonifacio.
The estimated investment for the construction of the work is €4.8 billion, of which €2.7 billion for the First Functional Lot to be completed by 2026
LMSteel Consulting provided the construction engineering services following the RFI project specifications and supporting the General Designer in the study of the launch phases.
The project was developed by creating the numerical models of the temporary structures with SAP2000 and the 3D BIM geometric models with Tekla Structures.
More information about the project at the following link:
- PLACE
- Verona - Padua (Italy)
- YEAR
- 2023
- StatE
- in progress
- ServiCES
- 3D BIM Modelling - Design for Manufacturing
- workshop-drawings and as-built
- Launching Phase assistance
- FINAL CLIENT
- RFI
- General Contractor
- Consorzio IRICAV 2 – Cossi Costruzioni spa (Webuild group)
- STEEL MANUFACTURER
- ATI FVS spa - LMV spa
- DESIGN TEAM
- Seteco Ingegneria
- WEIGHT [TON]
- 5000
Project Photo Gallery Arched Steel Bridges