380 kV Stade line power line
TenneT plans to build a new 380 kV line between the new Stade-West substation at the DOW chemical company site in Stade and the Landesbergen substation in the Nienburg / Weser district. The approximately 155 km long line increases the wind energy transmission capacity in the north-south axis and ensures the security of supply as well as the stability of the grid in Lower Saxony in the future. To cancel any type of error between the executive and construction design phases, LMSTEEL Consulting sagl was asked to carry out the 3D modeling activity of all the pylons making up the line, starting from the project documents up to the issue of NC files for numerical control machines. The activity lasted about 12 months and involved us in the validation of the design choices and in the improvement technical choices desired by the manufacturer.
- PLACE
- Germania
- YEAR
- 2019
- StatE
- Completato
- ServiCES
- Progettazione Strutturale Esecutiva acciaio+ca, Contributo coordinamento multidisciplinare strutture+facciate+MEP, Modellazione BIM - Design for Manufacturing, Construction Management, Piani di officina, montaggio e as-built
- final CUSTOMER
- Omexom Power&Grid
- EPC Contractor
- TenneT TSO GmbH
- MetalWORKER
- Riservato
- WEIGHT [ton]
- 2800
- SURFACE [km]
- 155
380 kV Stade line power line